INVESTA, HOCHTIEF and Groth Group
Köbis Dreieck Berlin-Fonds GmbH & Co. KG
Office
Completed 10/2005
approx. 12.200 m²
approx. 27 m
Sound facade decisions start with a clear understanding of the project’s starting point.
Decision criteria and priorities
Facade design for statutory approval develops an existing facade concept for the project’s approval and coordination context.
Technical facade design develops an agreed facade solution into coordinated technical information for implementation.
Facade specifications and tender documentation translate developed facade design into clear technical requirements for tendering and bid comparison.
During technical tender evaluation, Priedemann compares submitted facade bids with the previously defined requirements and tender documents.
After a facade manufacturer is appointed, Priedemann reviews its shop drawings, system planning and technical submittals against the agreed design basis.
Priedemann supports the execution of facade mock-ups during the planning phase, ahead of the usual appointment of a facade manufacturer. For physical mock-ups, Priedemann helps prepare tests, takes part in testing and reviews test reports. For visual mock-ups, Priedemann supports comparison with design requirements. The aim is greater planning and execution confidence at an earlier project stage.
The supervision of assembly and installation is particularly important for us, to ensure the agreed quality. Our principle is that deviations from the agreed planning must be identified at an early stage, documented and the implementation corrected. This controlling refers both to production and manufacturing as well as to the assembly on the building site:
Regular inspection of production and assembly in the factoryThermal building physics connects the facade build-up with the building’s energy and building-physics requirements.
Facade performance and building energy
Priedemann produces energy saving certificates based on the existing building data, which represent the most important energy consumption data and characteristic values in accordance with local legal requirements. For Germany we are also authorized to assess such evidence.
For completed projects or ongoing projects – depending on local regulations and the determination of specific building data – we can issue energy efficiency certificates that illustrate the energy consumption of the building as a whole, i.e. in the interaction of building services, facade and use.