ARGE Ostbahnhof Technical Management STRABAG
Deutsche Bahn AG
BGKK Becker Gewers Kühn & Kühn
Traffic Station with Services and Retail
Completed 05/2000
approx. 3.800 m²
approx. 15 m
Sound facade decisions start with a clear understanding of the project’s starting point.
Decision criteria and priorities
Priedemann offers comprehensive knowledge of materials, types of construction and construction methods for assessing the quality and value of the inventory with minimized depth of interference with the material.
Taking into account listed buildings, economic and design requirements such as preservation of individual details, renovation during ongoing operation, gutting with new extension, etc., we develop targeted renovation concepts for the facade on the basis of precise measurements as well as material, strength and load-bearing capacity analyses.
Facade design for statutory approval develops an existing facade concept for the project’s approval and coordination context.
During technical tender evaluation, Priedemann compares submitted facade bids with the previously defined requirements and tender documents.
After a facade manufacturer is appointed, Priedemann reviews its shop drawings, system planning and technical submittals against the agreed design basis.
The supervision of assembly and installation is particularly important for us, to ensure the agreed quality. Our principle is that deviations from the agreed planning must be identified at an early stage, documented and the implementation corrected. This controlling refers both to production and manufacturing as well as to the assembly on the building site:
Regular inspection of production and assembly in the factory