Continent
Europe (57)
Asia (31)
Africa (2)
Americas (3)
Country
Azerbaijan (1)
Bulgaria (1)
China (1)
Germany (45)
India (2)
Canada (1)
Qatar (6)
Kuwait (3)
Lebanon (1)
Mauritius (1)
Panama (1)
Russia (7)
Saudi Arabia (4)
Czechia (1)
Turkey (7)
Hungary (1)
United Arab Emirates (6)
United States of America (1)
Egypt (1)
United Kingdom (2)
Building Function
Education (4)
Office (54)
Health (4)
Shopping (23)
High-Rise (22)
Hotel (14)
Culture (9)
Mixed-Use (29)
Sport (1)
Transport (8)
Residential (14)
Key Feature
Unitized Curtain Wall (46)
Stick System (54)
Double Skin (11)
Glass Fin (5)
Rain Screen (32)
Exhaust Air (3)
Roof (21)
Energy (8)
Security (3)
Sun Protection (34)
Geometry (16)
Innovation (8)
Main Material
Ceramic (8)
Composite (12)
Concrete (5)
Glass (71)
Metal (53)
Membrane (2)
Stone (18)
Wood (3)
Other (5)
Height
Up to 50m (49)
Up to 100m (19)
Up to 200m (15)
Up to 300m (8)
Higher (2)
Our Services
Research & Development (10)
Consultancy (80)
Engineering (15)
Specials (44)
Continuous Support (4)
Refurbishment (12)
Status
Competition (0)
In Planning (4)
Under Construction (3)
Completed (91)
Not Built (0)

Ostbahnhof, Berlin


Map 

Client

ARGE Ostbahnhof Technical Management STRABAG


Owner / Developer

Deutsche Bahn AG


Architect

BGKK Becker Gewers Kühn & Kühn


Building Function

Traffic Station with Services and Retail


Status

Completed 05/2000


Facade Scale

approx. 3.800 m²


Height

approx. 15 m


Technical Features
  • Double skin facade
  • Hanging structure
  • Clamped, point-fixed, large sized glazing
  • Walkways as stiffening elements
  • Glass canopy with silk screen printing

View location in Google Maps

We provided

Consultancy

Sound facade decisions start with a clear understanding of the project’s starting point.

  • Priedemann organises the available project information, design intent, use, and facade-related technical and external requirements.
  • Together with the project participants, objectives, priorities, constraints and unresolved questions are made visible.
  • This creates a reliable basis for the next design steps and for decisions before the facade concept is developed in greater detail.
  • Priedemann identifies and structures the project information, requirements, objectives and constraints relevant to facade planning.
  • These may include design intent, use, technical and energy-related requirements, local conditions, and quality, cost and programme objectives.
  • Unresolved questions, dependencies and competing priorities are made explicit and translated into clear decision criteria.
  • This creates a reliable basis for early facade design and subsequent planning.
  • The subjects reviewed and documented depend on the project stage and agreed scope.

Decision criteria and priorities

  • Not every facade requirement has the same priority within a project.
  • Design intent, use, technical requirements, local conditions, quality, cost and programme objectives can influence one another.
  • Establishing the project basis therefore also means structuring these requirements and making potential conflicts visible.
  • The resulting criteria provide a shared basis against which later options and decisions can be assessed consistently.

Priedemann offers comprehensive knowledge of materials, types of construction and construction methods for assessing the quality and value of the inventory with minimized depth of interference with the material.

Taking into account listed buildings, economic and design requirements such as preservation of individual details, renovation during ongoing operation, gutting with new extension, etc., we develop targeted renovation concepts for the facade on the basis of precise measurements as well as material, strength and load-bearing capacity analyses.

Facade design for statutory approval develops an existing facade concept for the project’s approval and coordination context.

  • Priedemann brings together available design information, technical requirements, materials, facade types and interfaces.
  • Depending on the project, fire, safety, building-physics and acoustic requirements are also considered.
  • The result is a clear facade basis for coordination with the relevant disciplines and for subsequent design.
  • Facade design for statutory approval develops the facade information needed to demonstrate relevant approval requirements.
  • Depending on the appointment, Priedemann addresses technical facade subjects, interfaces, fire and safety requirements, and the necessary design information.
  • Unresolved points are coordinated with the relevant disciplines and technical contributions are documented.
  • The scope, submission process and responsibility for the complete statutory application are agreed for the project.

During technical tender evaluation, Priedemann compares submitted facade bids with the previously defined requirements and tender documents.

  • The review can cover technical content, qualification evidence, bidder alternatives, proposed systems and identifiable deviations.
  • Unresolved points are structured for tender interviews and the findings are documented clearly.
  • Price-related or commercial assessment is included only where it is expressly part of the appointment.
  • During technical tender evaluation, Priedemann compares facade bids with the defined requirements and tender documentation.
  • The review may consider technical completeness, qualifications, proposed systems and materials, bidder alternatives, and identifiable deviations or risks.
  • Findings are documented clearly and can provide technical support during tender interviews.
  • Price comparison, commercial review and the final award decision form part of the service only where expressly agreed.

After a facade manufacturer is appointed, Priedemann reviews its shop drawings, system planning and technical submittals against the agreed design basis.

  • This includes comparison with project changes, assessment of structural assumptions and energy/acoustic performance values, and review of technical data sheets for materials and components.
  • Priedemann comments on discrepancies and coordinates change management as the facade contact point for the planning team.
  • Priedemann reviews the contractor’s shop-drawing information against the agreed requirements and released design basis.
  • Depending on the appointment, the review covers system components, details, interfaces, technical assumptions, materials and relevant performance data.
  • Deviations and unresolved questions are documented and coordinated with the design team.
  • In this way, the review supports technical quality assurance and makes required decisions visible early.

The supervision of assembly and installation is particularly important for us, to ensure the agreed quality. Our principle is that deviations from the agreed planning must be identified at an early stage, documented and the implementation corrected. This controlling refers both to production and manufacturing as well as to the assembly on the building site:

Regular inspection of production and assembly in the factory
  • Verification of compliance with the approved design, ensuring compliance with the agreed qualities, standards and test series
  • Regular reporting on production progress; the reports contain recommendations for possible improvements as well as a list of unfulfilled services, performance arrears, defects identified
Regular inspection at the building site
  • Verification of compliance with the approved design, ensuring compliance with the agreed qualities, standards and test series
  • Inspection of examples of facade sections as reference values for determining the quality of workmanship – benchmark inspections
  • Involvement in performance tests on the facade on the building site (water impermeability, sound insulation, blower door test, etc.)
  • Random inspection of the installation work on the building site
  • Regular reporting on the installation work including the identification of discrepancies with the original planning
Let's talk about your project