Cladtech International
Saudi Aramco
Hyundai-El Seif
Sports Stadium, Multi-Purpose Hall
Completed 05/2014
approx. 5.900 m²
approx. 28 m
With the award of the contract, we check the contractual framework conditions as the basis for the implementation. If necessary, we adapt the technical solutions to any requirements that have changed – always with the goals of our client in mind.
Depending on requirements, Priedemann analyzes and calculates the static requirements of e.g. profiles, glazing and fixings in 2 or 3 dimensions or as finite elements. Evidence is provided on the basis of the applicable international or national standards.
Priedemann prepares shop drawings for the contractor of a facade project, based on the already-released design documents.
Good installation planning connects the intended facade quality with a clear sequence on site.
Priedemann creates, analyses and optimises digital 3D models as a technical basis for further facade design and subsequent fabrication.