Sound facade decisions start with a clear understanding of the project’s starting point.
Decision criteria and priorities
Priedemann offers comprehensive knowledge of materials, types of construction and construction methods for assessing the quality and value of the inventory with minimized depth of interference with the material.
Taking into account listed buildings, economic and design requirements such as preservation of individual details, renovation during ongoing operation, gutting with new extension, etc., we develop targeted renovation concepts for the facade on the basis of precise measurements as well as material, strength and load-bearing capacity analyses.
Early facade design begins once the strategic objectives and principal requirements of a project are sufficiently understood for possible directions to be developed.
Facade design for statutory approval develops an existing facade concept for the project’s approval and coordination context.
Technical facade design develops an agreed facade solution into coordinated technical information for implementation.
Facade specifications and tender documentation translate developed facade design into clear technical requirements for tendering and bid comparison.
During technical tender evaluation, Priedemann compares submitted facade bids with the previously defined requirements and tender documents.
After a facade manufacturer is appointed, Priedemann reviews its shop drawings, system planning and technical submittals against the agreed design basis.
Priedemann supports the execution of facade mock-ups during the planning phase, ahead of the usual appointment of a facade manufacturer. For physical mock-ups, Priedemann helps prepare tests, takes part in testing and reviews test reports. For visual mock-ups, Priedemann supports comparison with design requirements. The aim is greater planning and execution confidence at an earlier project stage.
The supervision of assembly and installation is particularly important for us, to ensure the agreed quality. Our principle is that deviations from the agreed planning must be identified at an early stage, documented and the implementation corrected. This controlling refers both to production and manufacturing as well as to the assembly on the building site:
Regular inspection of production and assembly in the factoryPriedemann supports the transition of the completed facade to handover: taking part in the acceptance walk-through, documenting the final inspection with observations and recommendations, compiling as-built, operating and maintenance documentation, and checking that documentation for completeness.