ICD Brookfield Management
ICD Brookfield Management
Foster + Partners
Mixed-Use, Office, Retail
Completed 10/ 2021
approx. 61.000 m²
approx. 115.000 m²
approx. 283 m
Sound facade decisions start with a clear understanding of the project’s starting point.
Decision criteria and priorities
Early facade design begins once the strategic objectives and principal requirements of a project are sufficiently understood for possible directions to be developed.
Facade design for statutory approval develops an existing facade concept for the project’s approval and coordination context.
Technical facade design develops an agreed facade solution into coordinated technical information for implementation.
Facade specifications and tender documentation translate developed facade design into clear technical requirements for tendering and bid comparison.
During technical tender evaluation, Priedemann compares submitted facade bids with the previously defined requirements and tender documents.
After a facade manufacturer is appointed, Priedemann reviews its shop drawings, system planning and technical submittals against the agreed design basis.
Priedemann supports the execution of facade mock-ups during the planning phase, ahead of the usual appointment of a facade manufacturer. For physical mock-ups, Priedemann helps prepare tests, takes part in testing and reviews test reports. For visual mock-ups, Priedemann supports comparison with design requirements. The aim is greater planning and execution confidence at an earlier project stage.
The supervision of assembly and installation is particularly important for us, to ensure the agreed quality. Our principle is that deviations from the agreed planning must be identified at an early stage, documented and the implementation corrected. This controlling refers both to production and manufacturing as well as to the assembly on the building site:
Regular inspection of production and assembly in the factory