GEBAU Technik GmbH
DIFA Deutsche Immobilien Fonds AG
Bellmann & Böhm Architekten
Hotel
Completed 04/2004
approx. 4.000 m²
approx. 22 m
Sound facade decisions start with a clear understanding of the project’s starting point.
Decision criteria and priorities
Priedemann offers comprehensive knowledge of materials, types of construction and construction methods for assessing the quality and value of the inventory with minimized depth of interference with the material.
Taking into account listed buildings, economic and design requirements such as preservation of individual details, renovation during ongoing operation, gutting with new extension, etc., we develop targeted renovation concepts for the facade on the basis of precise measurements as well as material, strength and load-bearing capacity analyses.
Early facade design begins once the strategic objectives and principal requirements of a project are sufficiently understood for possible directions to be developed.
Technical facade design develops an agreed facade solution into coordinated technical information for implementation.
Facade specifications and tender documentation translate developed facade design into clear technical requirements for tendering and bid comparison.
The supervision of assembly and installation is particularly important for us, to ensure the agreed quality. Our principle is that deviations from the agreed planning must be identified at an early stage, documented and the implementation corrected. This controlling refers both to production and manufacturing as well as to the assembly on the building site:
Regular inspection of production and assembly in the factoryThermal building physics connects the facade build-up with the building’s energy and building-physics requirements.
Facade performance and building energy