After a facade manufacturer is appointed, Priedemann reviews its shop drawings, system planning and technical submittals against the agreed design basis.
This includes comparison with project changes, assessment of structural assumptions and energy/acoustic performance values, and review of technical data sheets for materials and components.
Priedemann comments on discrepancies and coordinates change management as the facade contact point for the planning team.
Priedemann reviews the contractor’s shop-drawing information against the agreed requirements and released design basis.
Depending on the appointment, the review covers system components, details, interfaces, technical assumptions, materials and relevant performance data.
Deviations and unresolved questions are documented and coordinated with the design team.
In this way, the review supports technical quality assurance and makes required decisions visible early.