As-Built Drawings for Completed Facades

With the final phase of the project, Priedemann coordinates the handover of the completed facade to the client. This includes a joint acceptance walk-through on site, a final report with observations and recommendations, and preparation of the as-built drawings documenting the facade actually built. The handover scope can also include an operating manual and a final meeting with the client.

  • Priedemann prepares as-built drawings that document the facade as actually constructed.
  • They are based on released design information, documented changes and verified information from the responsible contractors.
  • Depending on the appointment, details, materials, connections and relevant operating information are incorporated into the as-built documentation.
  • The documents support handover, operation, maintenance and future alterations.
  • Their accuracy depends on the quality and reliability of the construction information provided.
Let's talk about your project