Facade Installation Planning and Documentation

Good installation planning connects the intended facade quality with a clear sequence on site.

  • Priedemann considers installation and logistics sequences, assembly processes and interfaces with other trades in advance and prepares clear installation information.
  • This allows elements, fixings, access and work sequences to be coordinated consistently with the planned execution.
  • Priedemann prepares installation and logistics documentation for the planned facade works.
  • This may include installation sequences, assembly and layout drawings, information on substructures and fixings, and drawings for integrated components.
  • Elements, access, transport routes and interfaces are represented so that installation can be prepared consistently.
  • The documents build on the coordinated production information.
  • Site management, health and safety, and responsibility for execution remain with the responsible contractors.